Head of Project Development
Listed by employer · Checked
Older posting · still listed ·
- Work arrangement
- onsite
- Employment
- FullTime
- Stated compensation
- USD 170,000–200,000 1 YEAR
Does the location policy fit?
Choose where you would work from. We’ll compare it with the posting’s stated requirements.
Choose a country to check geographic compatibility. The source requirements are available below.
The employer’s posting date is more than 60 days ago. It remained listed at our last successful check; it may be a long-running or evergreen opening. Confirm availability on the original posting before applying.
Browse jobs posted in the past 60 days →This checks the posting’s stated requirements, not your legal right to work. Confirm details with the employer.
Requirements
1 with evidence8 unclear or unstated- Remote policy
- onsite
“Provider workplace type: onsite”
From employer posting metadata - Employment type
- FullTime
- Compensation
- USD 170,000–200,000 1 YEAR
8 fields not stated in this posting
- Employer sponsorship
- Not specified
- Geographic scope
- Not specified
- Degree requirement
- Not specified
- Security clearance
- Not mentioned
- Timezone / hours
- Not specified
- Citizenship requirement
- Not mentioned
- Minimum experience (years)
- Not specified
- Work authorization
- Not specified
These details were not stated in the tracked posting. Confirm with the employer.
Original job description
Reading view uses normalized posting text so exact evidence excerpts can be highlighted.
Show less description
Original formatting and links
About American Turbines
The power grid was built for a world that no longer exists. Centralized generation, hundred-mile transmission lines, decade-long permitting cycles. Meanwhile, demand is exploding: data centers, industrial electrification, remote operations that need megawatts yesterday and can't wait for utilities to catch up.
American Turbines is designing small modular gas turbines, purpose-built for distributed power generation. Machines designed from a blank sheet to be manufactured at scale, clustered in arrays. Hundreds of units operating in parallel, dynamically matching load like a compute cluster matches demand. We are a seed-stage company backed by the investors behind SpaceX, Boom Supersonic, and Hadrian.
About the Role
The Head of Project Development will put our machines on the ground. Sites, gas, permits, interconnect: everything between a signed order and a machine running at a customer site is yours.
You will identify and qualify sites, negotiate gas supply, run the permitting process with state and local agencies, and set deployment timelines with customers. You will define the standard development process so each site is faster than the last.
What We're Looking For
Experience developing power projects: gas generation, gensets, solar and storage, or data center sites. You have taken at least one project from site acquisition through permitting to commissioning.
Working knowledge of air permitting for gas-fired equipment at the state and local level. Texas experience strongly preferred. Direct experience negotiating with landowners, gas suppliers, utilities, and permitting authorities.
You manage schedule aggressively and run workstreams in parallel.
No similar roles found yet — browse all american-turbines jobs.