Senior Supply Chain Planner
Listed by employer · Checked
Older posting · still listed ·
- Work arrangement
- Not stated
- Employment
- Not stated
- Stated compensation
- Not specified
- Stated sponsorship
- Not stated
Does the location policy fit?
Choose where you would work from. We’ll compare it with the posting’s stated requirements.
Choose a country to check geographic compatibility. The source requirements are available below.
The employer’s posting date is more than 60 days ago. It remained listed at our last successful check; it may be a long-running or evergreen opening. Confirm availability on the original posting before applying.
Browse jobs posted in the past 60 days →This checks the posting’s stated requirements, not your legal right to work. Confirm details with the employer.
Requirements
1 with evidence8 unclear or unstated- Remote policy
- onsite
“Based in El Segundo, CA, onsite five days a week.”
See matched passage in original description ↓
10 fields not stated in this posting
- Employer sponsorship
- Not specified
- Geographic scope
- Not specified
- Degree requirement
- Not specified
- Security clearance
- Not mentioned
- Timezone / hours
- Not specified
- Citizenship requirement
- Not mentioned
- Minimum experience (years)
- Not specified
- Work authorization
- Not specified
- Employment type
- Not specified
- Compensation
- Not specified
These details were not stated in the tracked posting. Confirm with the employer.
Original job description
Reading view uses normalized posting text so exact evidence excerpts can be highlighted.
Show less description
Original formatting and links
There was a time when all of America believed that the future of the physical world could be radically different. The engineers of the mid-1900s put a man on the moon in eight years, designed and built planes and submarines from scratch in under three, and conceived of building things we wouldn’t even be able to dream up today.
Today, the last of the engineers who imagined and built these systems are retiring. As they go, we lose not only the engineering knowledge gained from their decades of imagination and trial-and-error, but also the spirit that made that imagination possible.
Amca is working day-in and day-out to restore America’s ability to engineer anything that our critical systems depend on, and reinvigorate the cycle of creation that allows imagination to shape physical reality. We rapidly develop and manufacture new critical components and subsystems required to build and sustain the planes, military vehicles, and core infrastructure America needs. By restoring the capability of our antiquated supply chains, we increase the country’s capacity to imagine and realize new systems, and make a physical world that looks very different from today.
Senior Supply Chain Planner
Overview
Amca is building its own ERP system and the MRP that will run inside it. We need a senior supply chain planner to help us get MRP right. You will bring the judgment that comes from having planned for real production and apply it to how the system handles demand, BOMs, lead times, and order policies. You will write the planning requirements, work directly with the engineers building the system, and test MRP outputs to continually improve them.
The rest of the job is one you already know. You will own the master production schedule for El Segundo, maintain the BOMs and planning parameters MRP runs on, and release clean purchase signals to buyers. If the MRP outputs need manual correction before release, you will also correct what caused the signal to be wrong in the first place.
As Amca's homegrown ERP scales across our factories, the planning processes you define in El Segundo are the ones the rest of the company will inherit.
Responsibilities
Shaping Our MRP
- Own the planning requirements for Amca's custom MRP, covering how demand is calculated against inventory and open orders, how BOMs and revision effectivity are handled, and how lead times, order policies, exception logic, and RFPO release should work
- Work alongside the engineering team through design, build, and release, and build planning logic that will survive contact with reality
- Test new functionality against real builds and real data, define the acceptance criteria, and find the failure cases before they reach production
- Define our planning processes, standards, and documentation as Amca scales to more factories
Demand Signal and Master Scheduling
- Own the master production schedule for El Segundo, setting build sequence, quantities, and dates against customer commitments and factory capacity
- Review MRP output after each automated run and release requests for purchase order (RFPOs) with enough lead time for buyers to act
- Pull orders in and push them out as priorities shift, and escalate early when the schedule is not achievable
Data Integrity
- Own the lead times, order policies, safety stock, lot sizes, yields, and part statuses that MRP depends on
- Create, maintain, and audit BOMs so they match what the floor builds and what supply chain buys, and drive engineering change through the system as revisions move
- Reconcile inventory records to cycle counts, WIP, receipts, and MRB
- Drive the number of exceptions and manual overrides toward zero by correcting the root cause in the data or the process, so the same problem stops resurfacing and the signal can be trusted on its face
Cross-Functional Execution
- Release RFPOs early enough to act on, with the part, date, build, and slack a buyer needs to prioritize
- Work with production, manufacturing engineering, and program teams on build feasibility, new part introduction, and revision changes
- Flag shortages, long lead exposure, and schedule risk early, naming parts, dates, and impact
- Set the bar for the planners who follow you, through the standards you write and the people you train
Expectations
In your first year, your signals are trusted by buyers and production, and our MRP system is better for your having been here. Buyers work from your signals verbatim instead of working around them, no build stops for a part nobody knew was missing, the plan needs fewer manual corrections than it did when you started, the planning logic running in production is logic you specified, and a planner joining next year can learn this job from documentation you wrote.
Qualifications
- 5+ years in production planning, materials planning, master scheduling, or supply chain systems in a manufacturing environment
- Experience through at least one ERP or MRP implementation, migration, or major reconfiguration, in a role where you fundamentally shaped how planning worked
- Demonstrated ownership of a master production schedule or a significant planning segment
- Deep MRP fluency, including how the plan calculates what to buy against what you already have, how order policies and planning settings behave, and what breaks downstream when they are set wrong
- Working knowledge of BOMs and how engineering changes flow through them
- Precise and detail-driven, willing to run a discrepancy down until you know what caused it
- Direct communicator who can hold a position with engineers and thrives when the plan changes
Preferred Qualifications
- Aerospace, defense, or precision manufacturing background
- Experience writing requirements for planning software with an engineering team
- Planning across multiple sites or factories in a multi-entity organization
- Familiarity with configuration control, effectivity dates, and engineering change orders
- SQL, Power BI, or exposure to capacity planning
Additional Requirements
- Based in El Segundo, CA, onsite five days a week. Remote work is not considered.
- Ability to travel up to 15% to Amca factories
- Willing to work extended hours as needed to support production
Annual Salary Range$110,000—$150,000 USDHourly Pay Range$52.88—$72.12 USD
This position requires use of information which is subject to the International Traffic in Arms Regulations (ITAR). All applicants must be U.S. persons within the meaning of ITAR. ITAR defines a US person as: any individual who is granted U.S. citizenship; or. any individual who is granted U.S. permanent residence ("Green Card" holder); or. any individual who is granted status as a "protected person" under 8 U.S.C 1324b(a)(3).
Amca, Inc prohibits discrimination or harassment based on the following categories: race, color, religion, religious creed (including religious dress and grooming practices), national origin, ancestry, citizenship, physical or mental disability, medical condition (including cancer and genetic characteristics), genetic information, marital status, sex (including pregnancy, childbirth, breastfeeding, or related medical conditions), gender, gender identity, gender expression, age (40 years and over), sexual orientation, veteran and/or military status, protected medical leaves (requesting or approved for leave under the Family and Medical Leave Act or the California Family Rights Act), domestic violence victim status, political affiliation, and any other status protected by state or federal law.
No similar roles found yet — browse all Amca jobs.
